Project Call: STORAGE BATTERY PLANT

PHASE 1- STARTING AND STATIONARY BATTERIES;

PHASE 2 -TRACTION BATTERIES

Capacity: The number of the storage batteries will be determined by the input quantity of metal + alloy for their production -25 000 t/y.

The batteries’ type, as regards voltage, capacity and shape, will be specified during the stage of development of the project.

Potential markets: European Union; Turkey; China; Russia; Others.

Material supply: The necessary metal, alloys and acid will be provided by the production plants of KCM AD, Plovdiv and represent about 20-:-25 % of KCM’s lead production.

The plastic boxes will be delivered on request from a new plant for such products, constructed in close proximity to the site of the projected plant for batteries.

Human resources: will be ensured from the region and their special qualification will be provided by the educational center of KCM.

Location: Trakia Economic Zone, Plovdiv, that is in close proximity with KCM and has a direct connection with the national railway – 0,5 km, international airport – 1 km, highway E80 – 15 km, first class road to the Aegean sea – 0,5 km.

Project Call: STORAGE BATTERY PLANT

Leave a Reply